Monday, November 23, 2009

Table cont. day 2

Day two, I had to mix the first layer of slip to lay in the middle of the table so that it would rise up and the tiles would be flesh with the top of the table.

I used this rake sort of thing to smooth the first layer around.
I started laying down the tile. Each tile had to be 1/8' apart slightly. I was a little off by measurements just because the table and the titles were slightly off. I used at first these little 1/8' crosses to put in between each tile as I laid them down.



This is putting the second to last piece on. After I was done doing that I had to wait until it was dry which took till the next day.

No comments:

Post a Comment